SCULPTURE AND INSTALLATION
a container for notions, thoughts and processes I encounter along the way
Saturday, 27 June 2009
Test projections
Projection-tests with some video footage Jo had prepared. The size of the studio space forced me to project from the hall outside the studio through the door to get a reasonable distance to the screen. So, the set-up isn't as planned but nevertheless gives a taste of what it will look like.
Thursday, 18 June 2009
Friday, 5 June 2009
Half-time
[Seascape screen]
Spider's job: The first half of the screen is completed.
View from behind the screen
Spider's job: The first half of the screen is completed.
View from behind the screen
Monday, 1 June 2009
Seascape screen
This screen is composed of 30 silk threads per inch which contract to about 55 tpi because of the twisted shape.
Currently I'm fixing three of the six bands needed. It takes quite a while to adjust the threads' tension and the density at the bottom. Lots of tiny movements, but after a day I feel as tired as if I'd really worked... Yet - I had a visit from a small assistant, probably interested in helping me: a spider (can you see it on the image?).
Subscribe to:
Posts (Atom)